2013 Shot breakdown

Norwegian
3D team: 3 people
Length of time I spent: 2 weeks
Compositing, rotoscoping, tracking, camera animation.

Av og til
3D team: 3 people
Length of time I spent: 2 weeks
Animation, compositing

Connoisseur – yoghurt
3D team: 3 people
Length of time I spent: 2 weeks
Lighting, texturing, rendering, lookdev and compositing

Lexus – ISF
3D team: 6 people
Length of time I spent: 3 weeks
30 second spot
Model car to perfection

Nescafe – Green Blend
3D team: 2 people
Length of time I spent: 2 weeks
45 second spot
Creation of spherical HDRI used for lighting and reflections, shot on set by me with my equipment, stitched graded and implemented, all textures and materials, design of beans and spoon, all modeling, all render passes needed, only animation done by someone else.

Rhinocort – protect and relieve
3D team: 4 people
Length of time I spent: 2 weeks
30 second spot
All rigging, some animation.

Toyota – Carolla
3D team: me
Length of time I spent: 3 weeks
30 second spot
TD on set, all 3d plus composite direction

Origin Energy
3D team: 2 people
Lenght of time I spent: 4 weeks
45 second spot
Camera tracking, procedural branch creation and modeling, all texturing, rendering and lighting, grading of 3d content

Nestle – club
3D team: 4 people
Length of time I spent: 1 week
40 second spot
Model and animate some structures to be compliant with realflow, render farm/systems set up and management

Alfa Remeo – Giulietta
3D team: 3 people
Length of time I spent: 3 weeks
Head of 3D, modelling, lookdev, texturing, lighting

SBS – Australia
3D team: 3 people
Lenght of time I spent: a few days
Head of 3D, ferns and grass

Target – Toy Sale
3D team: 6 people
Length of project 6 weeks
45 second spot
Technical Director, lead/head of 3D, all lighting, scene management, some modeling, some texturing, almost all render passes

Renalt – Laguna
3D team: 6 people
Lenght of time I spent: 8 weeks
45 second spot
Lighting, lookdev, lead, texturing, modeling, HDRI creation, problem solving

Presets – Are You The One Remix
3D team: 4 people
Length of time on project: 2 weeks
3 minute video clip
Head of 3D, lead, technical director, lookdev, all lighting, all render passes, most texturing, some modeling

JC Penny
3D team: 2 people
Lenght of time I spent: 4 weeks
45 second spot
Camera tracking
Onset TD, all modeling, texturing, lighting and rendering, previz

RA Resort
3D team: 2 people
Lenght of time I spent: 5 weeks
5 minuets long
Technical Director, lead, previz, camera motion, half of the modeling, all textuing, rendering and lighting

Theraflu
3D team: 2 people
Lenght of time I spent: 8 weeks
Two spots one 45 second one 30 second
Camera Tracking, character modeling, rigging, animation and texturing

Target – Denim Nation (Dragon)
3D team: 3 people
Lenght of time I spent: 6 weeks
45 second spot
Technical Director, camera tracking, modeling, displacement, model clean up, texturing, lighting and rendering

SBS World Sport – Intro
3D team: 2 people
Lenght of time I spent: 4 weeks
45 second intro
Technical Director, everything accept render wrangling, previs, camera animation, all modeling, rendering, lighting/lookdev, texturing

KY – Yours and mine
3D team: me
Lenght of time I spent: 1 week
End product shot
Design of petels, texturing, lookdev/lighiting, dinamics simulation.

The Know – Intro
3D team: 2 people
Lenght of time I spent: 4 weeks
45 second intro
All Modeling and text

Target – Denim Nation (Flower)
3D team: 2 people
Lenght of time I spent: 4 weeks
45 second spot
Camera tracking
Modeling, camera animation, procedural flower modeling and animation, bird model clean up rig and animate, rendering, texturing and lighting

Royal Australian Institute of Architects – Annual meeting intro
3D team: 1 person
Lenght of time I spent: 1 week
30 second intro
Technical director, previs, texturing, lighting and rendering, modeling and model clean up

Target – Denim Nation (train)
3D team: 2 people
Lenght of time I spent: 4 weeks
45 second spot
Camera tracking, modeling, texturing, rendering and lighting